In 2006 Rachel Woolliscroft set out to reduce the amount of construction waste Wates was sending to landfill. The disposal was costing Wates over £3.5 million pounds a year. Rachel set a target for all of the firm’s non-hazardous waste to be recycled by 2010. Her campaign started with an initiative to encourage construction sites [...]
↧